{"id":7339,"date":"2026-03-30T13:52:47","date_gmt":"2026-03-30T13:52:47","guid":{"rendered":"https:\/\/pekel2.ctemplate.com\/portfolio\/cwp-havuz-ve-acik-ocak-tanker-dolum-istasyonu-hdpe-borulama-ve-mekanik-isleri\/"},"modified":"2026-03-31T06:12:50","modified_gmt":"2026-03-31T06:12:50","slug":"cwp-pond-and-open-pit-tanker-filling-station-hdpe-piping-and-mechanical-works","status":"publish","type":"portfolio","link":"https:\/\/pekel2.ctemplate.com\/en\/projelerimiz\/cwp-havuz-ve-acik-ocak-tanker-dolum-istasyonu-hdpe-borulama-ve-mekanik-isleri\/","title":{"rendered":"CWP Pond and Open Pit Tanker Loading Station HDPE Piping and Mechanical Works"},"content":{"rendered":"<p>As PEKEL, discover the K\u0131\u015flada\u011f CWP Pond and Open Pit Tanker Loading Station HDPE piping and mechanical works we carried out for T\u00fcprag Metal Mining (Eldorado Gold). We prove our strength in the sector with our expert engineering solutions.<\/p>\n<h2>CWP Pond and Open Pit Tanker Loading Station HDPE Piping and Mechanical Works<\/h2>\n<p>As PEKEL, we continue to play a leading role in critical infrastructure projects aimed at increasing the operational efficiency of industrial plants. Operating in the U\u015fak, K\u0131\u015flada\u011f region <strong>T\u00fcprag Metal Mining Ind. Trade Inc. (Eldorado Gold)<\/strong> which we completed in cooperation with <strong>CWP Pond and Open Pit Tanker Loading Station<\/strong> project is one of the most concrete indicators of our competence in piping and mechanical works, which is our area of expertise.<\/p>\n<h3>High Standard Engineering and HDPE Piping Solutions<\/h3>\n<p>The mining sector is known for its challenging site conditions and operational processes requiring high durability. In this project, the installation of HDPE (High-Density Polyethylene) piping systems was carried out in accordance with the highest level engineering standards. HDPE pipe systems offer the most reliable <strong>construction<\/strong> and infrastructure solutions for open pit operations and chemical transfer processes thanks to their superior resistance to corrosion and long-lasting structures.<\/p>\n<p>The works we carried out within the scope of the project include:<\/p>\n<ul>\n<li>HDPE pipeline installation in accordance with the technical specifications suitable for the project site.<\/li>\n<li>Installation and commissioning of mechanical components of tanker loading stations.<\/li>\n<li>High-pressure fluid transfer lines integrated into the general infrastructure of the industrial plant.<\/li>\n<li>System installations with completed leak tests, in full compliance with occupational safety and environmental standards.<\/li>\n<\/ul>\n<h3>Sectoral Trust and Technical Competence<\/h3>\n<p>Each one we carry out within PEKEL <strong>project<\/strong>, is brought to life with disciplined planning and the use of advanced technology equipment. These mechanical works at the K\u0131\u015flada\u011f site are designed to optimize the filling capacity of the plant and ensure operational continuity. <strong>Manufacturing<\/strong> and the sensitivity we show in assembly processes form the basis of our business partnership with our employer T\u00fcprag Metal Mining.<\/p>\n<p><strong>Construction<\/strong> works and with our years of experience in the field of industrial engineering, we have the vision to deliver even the most complex projects on time and within budget targets. PEKEL will continue to contribute to the establishment of modern facilities in a wide range from mining to energy, from infrastructure to heavy industry.<\/p>\n<p>Meet PEKEL expertise for your professional engineering solutions and turnkey industrial projects. Our experience in the sector is your biggest guarantee for the future of your projects.<\/p>","protected":false},"excerpt":{"rendered":"<p>PEKEL olarak, T\u00fcprag Metal Madencilik (Eldorado Gold) i\u00e7in ger\u00e7ekle\u015ftirdi\u011fimiz K\u0131\u015flada\u011f CWP Havuz ve A\u00e7\u0131k Ocak Tanker Dolum \u0130stasyonu HDPE borulama ve mekanik i\u015flerini ke\u015ffedin. Uzman m\u00fchendislik \u00e7\u00f6z\u00fcmlerimizle sekt\u00f6rdeki g\u00fcc\u00fcm\u00fcz\u00fc kan\u0131tl\u0131yoruz. CWP Havuz ve A\u00e7\u0131k Ocak Tanker Dolum \u0130stasyonu HDPE Borulama ve Mekanik \u0130\u015fleri PEKEL olarak, end\u00fcstriyel tesislerin operasyonel verimlili\u011fini art\u0131rmaya y\u00f6nelik kritik altyap\u0131 projelerinde \u00f6nc\u00fc [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":8916,"template":"","portfolio-category":[45],"class_list":["post-7339","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","portfolio-category-mekanik-isler"],"_links":{"self":[{"href":"https:\/\/pekel2.ctemplate.com\/en\/wp-json\/wp\/v2\/portfolio\/7339","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pekel2.ctemplate.com\/en\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/pekel2.ctemplate.com\/en\/wp-json\/wp\/v2\/types\/portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/pekel2.ctemplate.com\/en\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":0,"href":"https:\/\/pekel2.ctemplate.com\/en\/wp-json\/wp\/v2\/portfolio\/7339\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pekel2.ctemplate.com\/en\/wp-json\/wp\/v2\/media\/8916"}],"wp:attachment":[{"href":"https:\/\/pekel2.ctemplate.com\/en\/wp-json\/wp\/v2\/media?parent=7339"}],"wp:term":[{"taxonomy":"portfolio-category","embeddable":true,"href":"https:\/\/pekel2.ctemplate.com\/en\/wp-json\/wp\/v2\/portfolio-category?post=7339"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}