{"id":7340,"date":"2026-03-30T13:52:47","date_gmt":"2026-03-30T13:52:47","guid":{"rendered":"https:\/\/pekel2.ctemplate.com\/portfolio\/cwp7a-havuzu-hdpe-borulama-alin-kaynagi-ve-cwp7a-pond-hdpe-piping-butt-welding-fusion-welding\/"},"modified":"2026-08-07T02:24:03","modified_gmt":"2026-08-07T02:24:03","slug":"cwp7a-pond-hdpe-piping-butt-fusion-welding-and-fusion-welding","status":"publish","type":"portfolio","link":"https:\/\/pekel2.ctemplate.com\/en\/projelerimiz\/cwp7a-havuzu-hdpe-borulama-alin-kaynagi-ve-fuzyon-kaynagi\/","title":{"rendered":"CWP7A Pond HDPE Piping (Butt Fusion Welding and Fusion Welding)"},"content":{"rendered":"<p>The CWP7A Pond HDPE piping project bearing PEKEL's signature was completed with high engineering standards in K\u0131\u015flada\u011f, U\u015fak in cooperation with T\u00fcprag Metal Madencilik.<\/p>\n<section>\n<h2>CWP7A Pond HDPE Piping Project: Excellence in Industrial Infrastructure<\/h2>\n<p>As PEKEL, we are proud to have successfully completed the CWP7A Pond HDPE piping project carried out with T\u00fcprag Metal Madencilik San. Tic. A.\u015e. (Eldorado Gold), one of Turkey's leading mining organizations. Conducted in the K\u0131\u015flada\u011f region, U\u015fak, this comprehensive <strong>construction and engineering<\/strong> work is of critical importance to ensure the operational continuity of industrial facilities.<\/p>\n<h3>High Technology and Precision Manufacturing Processes<\/h3>\n<p>Within the scope of our project, the installation of HDPE (High-Density Polyethylene) piping systems, which require high durability under challenging site conditions, was carried out. <strong>Construction<\/strong> Combining our expertise in the sector with advanced technology equipment and our expert technical staff, we meticulously applied the following processes:<\/p>\n<ul>\n<li><strong>Butt Fusion Welding:<\/strong> High-pressure-resistant butt welding applications guaranteeing the leak-tightness and structural integrity of pipeline networks.<\/li>\n<li><strong>Fusion Welding:<\/strong> Joining techniques in compliance with international standards, providing maximum efficiency at complex junction points.<\/li>\n<li><strong>Project Management and Engineering:<\/strong> Design and manufacturing of long-lasting piping infrastructure suitable for heavy-duty conditions required by the mining sector.<\/li>\n<\/ul>\n<h3>Your Reliable Solution Partner in Industrial Infrastructure<\/h3>\n<p>As PEKEL, <strong>construction and manufacturing<\/strong> By continuously increasing our competency in the field, we continue to be the preferred solution partner in large-scale industrial projects. As in the CWP7A Pond project, our priority in every project is occupational safety, environmental sustainability, and technical excellence. The methods we use in HDPE piping works maximize the chemical resistance and mechanical durability characteristics of the pipeline, ensuring that your investment maintains its efficiency for many years.<\/p>\n<h3>Why PEKEL?<\/h3>\n<p>With our sectoral experience and expert engineering staff, we provide professional responses to complex infrastructure needs. <strong>Project<\/strong> We keep quality control standards at the highest level at every stage of our processes, providing confidence to our stakeholders regarding on-time delivery and budget management. Collaborations we realize with institutions possessing a global vision, such as T\u00fcprag Metal Madencilik, are a reflection of our understanding of quality.<\/p>\n<p>You can also benefit from PEKEL's corporate strength for your industrial construction, piping, and engineering needs, and bring your projects to life with an expert team. Contact us for detailed information and our references.<\/p>\n<\/section>","protected":false},"excerpt":{"rendered":"<p>PEKEL imzal\u0131 CWP7A Havuzu HDPE borulama projesi; T\u00fcprag Metal Madencilik i\u015f birli\u011fiyle K\u0131\u015flada\u011f, U\u015fak&#8217;ta y\u00fcksek m\u00fchendislik standartlar\u0131yla tamamland\u0131. CWP7A Havuzu HDPE Borulama Projesi: End\u00fcstriyel Altyap\u0131da M\u00fckemmeliyet PEKEL olarak, T\u00fcrkiye\u2019nin \u00f6nde gelen madencilik kurulu\u015flar\u0131ndan biri olan T\u00fcprag Metal Madencilik San. Tic. A.\u015e. (Eldorado Gold) ile ger\u00e7ekle\u015ftirdi\u011fimiz CWP7A Havuzu HDPE borulama projesini ba\u015far\u0131yla tamamlam\u0131\u015f olman\u0131n gururunu ya\u015f\u0131yoruz. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":8936,"template":"","portfolio-category":[45],"class_list":["post-7340","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","portfolio-category-mekanik-isler"],"_links":{"self":[{"href":"https:\/\/pekel2.ctemplate.com\/en\/wp-json\/wp\/v2\/portfolio\/7340","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pekel2.ctemplate.com\/en\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/pekel2.ctemplate.com\/en\/wp-json\/wp\/v2\/types\/portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/pekel2.ctemplate.com\/en\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":1,"href":"https:\/\/pekel2.ctemplate.com\/en\/wp-json\/wp\/v2\/portfolio\/7340\/revisions"}],"predecessor-version":[{"id":10250,"href":"https:\/\/pekel2.ctemplate.com\/en\/wp-json\/wp\/v2\/portfolio\/7340\/revisions\/10250"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pekel2.ctemplate.com\/en\/wp-json\/wp\/v2\/media\/8936"}],"wp:attachment":[{"href":"https:\/\/pekel2.ctemplate.com\/en\/wp-json\/wp\/v2\/media?parent=7340"}],"wp:term":[{"taxonomy":"portfolio-category","embeddable":true,"href":"https:\/\/pekel2.ctemplate.com\/en\/wp-json\/wp\/v2\/portfolio-category?post=7340"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}